Monday 17 December 2012

CHANGES!

We have had to make many different changes to our original planning of our film. The following outlines the changes that we have had to make in order to make our final product more efficient and professional. 

The main problem that me and my partner had was that the whole length of the film in total was far to long to fit into the 2 minute opening we was expected to make. This meant that we had to change and cut some of the shots that we have included in our planning and storyboarding in order to shorten the overall time. The shots that were taken out as a result were:
1, 2, 3, 4, 5, 6, 12, 13, 17, 18, 24, 28, 30, 34 and 37. All of these shots were filmed, but when it came to editing we then decided what we should cut and what we should keep. 

Because some of the shots were cut, it also meant that some of the dialogue also had to be cut as the shot was no longer relevant, this was partly due to camera faults (not picking up sound). We also had to use our class member's camera at one stage as our camera ran out of battery life as we was filming as we did'nt have access to a plug point. This was not good as when we went to adapt it into our filming stage during editing the screen size was different and the colour balance had changed meaning that we could'nt use those shots either. 

No comments:

Post a Comment